English English
  • Slider 1
  • Slider 2
  • Slider 3

New attractive central bus stop was built in Burgas

* It is part of the activities under the project "Integrated Urban Transport of Burgas"
 
"The way will be situated the central bus station will provide free access to the platforms, and its importance will be highlighted by attractive architectural volume, turning it into a recognizable and sought part of the new scheme of public transport." That said Deputy Mayor for budget, finance, economics and business activities - Krassimir Stoychev during the ceremony "Groundbreaking" for the project "Construction of a central bus stop, including the reconstruction of the roadway on the boulevard "San Stefano" in the section between streetс "Stefan Stambolov" and "Hristo Botev" and reconstruction of traffic systems and supporting technical infrastructure" under the project" Integrated Urban Transport of Burgas". He added that good design and comfort can make your day more pleasant.

Mr. Stoytchev added that "to the newly designed central bus station is provided accessible environment for people with disabilities through heated concrete ramps - from east and west. From the north access is at the same level with the sidewalk with automatically openable door. Heated ramps and platforms in two areas of the station ensure safe movement of passengers getting on and off at the same level as buses and even when there are ice on the ground.

There are tactile tiles for all areas and special places for getting on and off the bus. The seats for waiting disabled people are fixed. "The constructor for the realization of the contract is" Strabag "EAD,. Sofia.

Project "Integrated Urban Transport of Burgas" with total cost of 130 894 784.10 lev and is funded by the Operational Program "Regional Development" 2007 – 2013, financed by the European Union through the European Regional Development Fund and the state budget of the Republic Bulgaria. The project includes several key components related to the modernization of public transport: the bus fleet renewal, reconstruction and renovation of the station and terminals, BRT line, establishing a system of bicycle paths, introduction of integrated management systems of public transport .

Successful implementation of the project will create conditions for improved mobility for people, reduce traffic congestion and greenhouse gas emissions, improve the safety of public transport.

Wednesday, July 2, 2014


Back to all news

Calls to national phone 070011356 and short number 1356 they are charged to the tariff plan of the subscriber.